Optional website analytics

Allow optional website analytics, including Google Tag Manager and video play events? You can send an enquiry with either choice and change your preference in the footer. Privacy notice

Technical resources

LINKARIS / TECHNICAL RESOURCES

What does a 100 W PA specification actually guarantee?

For OEM engineers setting an output acceptance criterion. A catalogue power class or a maximum-output declaration does not establish the minimum output at every frequency.

Updated 16 November 2026 · purchasing guidance 2026-11-16.2

Define the output before selecting the class

State whether you need maximum output, CW output, output at 1 dB gain compression (P1dB), or modulated average output. For modulated signals include the waveform, occupied bandwidth and the relevant linearity limit. Do not substitute one definition for another.

Match the measurement conditions

Compare frequency, input drive, supply, measurement reference plane, load, temperature, cooling and duration. A frequency interval in a catalogue shows a candidate operating range; it does not by itself establish flat output power or guaranteed linearity across that interval.

Read point tests as point tests

The two November 2026 100 W-class references on this site contain supplied outputs below 50 dBm at some points. These records remain candidates with conditions to confirm. They are not a full-band minimum 100 W guarantee. The public detail pages retain the record version, source scope and test caveats.

Turn the uncertainty into an acceptance question

Write the required minimum, applicable frequencies, signal and environmental conditions in your enquiry. Ask which matched-version specification and test evidence support that requirement. A missing parameter stays open for engineering review.

Ask for evidence at the complete-module level

Use the completed assembly and your operating conditions as the basis of comparison. A transistor choice or material name does not supply the missing module test evidence.

  • Which signal and operating conditions support the stated output?
  • Where is output measured, and which load and output-path conditions apply?
  • Which matched report and acceptance limits cover your proposed build?
Download centreSend project requirements